介绍香港龙鼓滩发电厂化学人员在缺乏原制造商的技术支持下,针对早期操作余热锅炉高压环路启动时遇到的磷酸盐“暂时消失”现象,经过2 a来不断试验和监控以达到现在采用的平衡磷酸盐处理方法。
In Hongkong Longgutan Power Plant without the technical support from the original manufacturing firms in the light of ″phosphate hideout & return″ phenomena occurring during start up of high pressure loops of heat recovery steam generator (HRSG) in early operation the chemical engineers through two years of continuous testing and monitoring have successfully developed the currently used balanced phosphate treatment method. This paper gives an introduction to their research and development process and achievement in this aspect.
出处
《中国电力》
CSCD
北大核心
2001年第1期6-12,共7页
Electric Power
关键词
余热锅炉
磷酸盐处理
水处理
火力发电厂
heat recovery steam generator(HRSG), phosphate treatment, boiler water treatment