摘要
重点描述了汽轮机的启动步骤 。
Both turbine and its controlling system are new types in Rizhao Power Plant.The turbine start up sequence has some typicalities.This paper introduces the basic construction of turbine and controlling system,modifies the start up procedure and analyzes its features.
出处
《山东电力技术》
2001年第2期60-61,70,共3页
Shandong Electric Power