摘要
简单介绍了湘雅医院新医疗区洁净手术部净化空调系统的设计和修改过程。该工程采用湿度优先控制系统,由新风系统负担手术室的全部湿负荷,解决了洁净手术部与新医疗区共用冷热源可能产生的问题,减少了常规一次回风空调系统中冷热抵消造成的能量浪费,取得了较好的节能效果。
Briefly presents the design and modification process of the clean operating departments.By adopting the humidity priority control system and handling all the moisture load of operating rooms by an outdoor air system,solves the potential problems caused by the clean operating departments and the new medical zone sharing with cold and heat sources,and reduces the energy waste caused by heat and cold offset in conventional primary return air systems,which obtains good energy saving effect.
出处
《暖通空调》
北大核心
2014年第6期89-92,70,共5页
Heating Ventilating & Air Conditioning
关键词
洁净手术部
手术室
净化空调系统
湿度优先控制
直接膨胀式空调系统冷热源
clean operating department
operating room
clean air conditioning system
humidity priority control
direct expansion air conditioning system
cold and heat source