大跨度悬浇钢筋混凝土拱桥合龙施工技术研究 被引量:2

Research on Closure Construction Technology of Large-span Cantilever Poured Reinforced Concrete Arch Bridge
下载PDF
导出
摘要 合龙段是悬浇钢筋混凝土拱桥施工的重点和难点,其直接关系到桥梁结构成桥后的线形以及受力状态,进而决定桥梁施工完成后是否达到合理成桥状态。文章以贵州木蓬特大桥为工程背景,以其合理成桥状态为目标,利用Midas/Civil有限元分析软件对结构进行静力计算,分析了不同合龙方案、合龙温度以及拱圈合龙后的拆索顺序对成桥后主拱圈的应力和挠度的影响,为以后同类型桥梁的合龙施工提供借鉴。 The closure section is the emphasis and difficulty for the construction of cantilever poured reinforced concrete arch bridge,which is directly related to the linear and force state of bridge structure after the completion, and then further determines whether the bridge construction can reach the reasonable bridge state after the completion.With Guizhou Mupeng Super-large Bridge as engineering back- ground,and with its reasonable bridge state as the goal,this article used the Midas/Civil finite element analysis software for the static calculation of the structure, and analyzed the impact of different closure plans, closure temperatures and cable demolition sequence after the closure of arch rings on the stress and deflection of main arch dngs after the bddge completion,thereby providing the reference for the future closure construction of bddges in the same type.
出处 《西部交通科技》 2014年第5期44-47,共4页 Western China Communications Science & Technology
关键词 大跨度 悬浇钢筋混凝土拱桥 合龙方案 拆索顺序 施工技术 有限元分析 Large span Cantilever poured reinforced concrete arch bddge Closure plan Cable removal sequencer Construction technology Finite element analysis
  • 相关文献

参考文献2

二级参考文献3

共引文献3

同被引文献10

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部