摘要
铁路客站是铁路建设的重要组成部分,新时期铁路客站建设综合体现"功能性、系统性、先进性、文化性、经济性"的原则,其建筑造型、使用功能及装饰效果受到高度关注。图纸深化过程就是根据现场实际情况将设计图纸进行精细化、具体化,使之能直接用于施工,详细介绍了郑州东站比较具有代表部位的深化设计。
Railroad station is a very important part of railroad construction. Railroad station construction embodies comprehensively general principles in new period, including functionality, system, advancement, culture, economy; and the architectural modeling, using function and decorative effect receive much concern. The deepening process of drawing is refinement and embodiment process of design drawing according to site actual conditions, thus the design drawing can be used in construction. This paper introduces the detailed design of typical position for Zhengzhou East Station.
出处
《施工技术》
CAS
北大核心
2014年第11期13-16,共4页
Construction Technology
基金
中国中铁股份公司科技开发计划项目(2010-重点-66)
关键词
火车站
装修
设计
安装
railroad stations
decoration
design
installation