期刊文献+

同步顶升法更换桥梁支座实例分析 被引量:10

The Case Study on Replacement of Bridge Bearing with Synchronizing Lifting Method
下载PDF
导出
摘要 桥梁同步顶升是一项精细、科学的工作,除了有科学的施工技术外,还要有可靠先进的装备,才能保证桥梁结构在顶升(落梁)过程中安全。顶升过程中,严格控制顶升动力和位移,才能保证桥梁结构的安全。严格控制顶升千斤顶的同步才能保证顶升平稳,以及避免顶升过程中出现结构损伤等现象。结合工程实例,详细介绍了桥梁病害及成因分析,同步顶升的设备要求及实施方法,以及更换支座后桥梁质量评价。 Synchronizing lifting of bridge should be elaborate and scientific, which needs advanced equipment to ensure bridge structure safety during lifting, as well as scientific construction technology. Strict control of lifting dynamic and displacement ensures bridge structure safety during lifting. Strict control of lifting jack synchronization ensures stable lifting to avoid structural damage during lifting. Based on engineering example, this paper introduces bridge diseases and cause analysis, equipment requirement and implementation method for synchronizing lifting, quality evaluation of the bridge after bearing replacement.
出处 《施工技术》 CAS 北大核心 2014年第11期61-63,共3页 Construction Technology
关键词 桥梁工程 悬臂梁桥 同步顶升 支座 监测 bridges cantilever bridges synchronizing lifting bearings monitoring
  • 相关文献

参考文献3

二级参考文献5

共引文献4

同被引文献71

引证文献10

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部