摘要
以成彭双线高速铁路CRTSⅢ型板无砟轨道为例,总结了施工测量控制、混凝土底座施工、轨道板的粗铺和精调、自密实混凝土调整层施工工艺以及关键点和控制点。
Taking CRTS Ⅲslab ballastless track for Chengdu-Pengzhou Double-track High-speed Railway as an example, the paper summarized the construction measurement control, concrete base construction, track slab placement and adjustment, the construction technology for the adjusting layer of self-compacting concrete, and the key and control points.