基于实时监控的高堆石坝施工进度影响因素研究 被引量:7

Study on influencing factors of construction progress of high rock-fill dam based on real-time monitoring
原文传递
导出
摘要 高堆石坝施工过程复杂,其施工进度受到诸多因素的影响,难以进行实时控制。本文在对高堆石坝施工进度影响因素全面分析的基础上,提出了基于实时监控的高堆石坝施工进度影响因素实时分析方法。通过运用基于GPS技术的实时监控系统,实时地提取重要的工程信息以及施工参数,并分析其内在规律,将其结果与堆石坝施工系统仿真中的相应参数进行比对,建立多元线性回归模型分析各影响因素与施工进度的相关性,并通过工程实例证明该方法为堆石坝施工进度的实时控制提供了分析手段和科学的决策依据。 Construction progress of high rock-fill dam is complicated and can be affected by many factors, which leads to difficulties in real-time monitoring. This paper describes a real-time analysis method based on real-time monitoring to examine the influencing factors of construction progress of high rock-fill dam. In this method, the important engineering information and construction parameters are real-timely obtained and the inherent laws are analyzed using a GPS-based real-time monitoring system. These parameters are compared with those calculated by system simulations of the same construction progress, and a multiple linear regression model is developed for analysis of the correlations of the influencing factors with the rate of construction process. Application to a case study of real project shows that the method provides a useful tool and a basis for real-time control of construction progress of high rock-fill dams.
出处 《水力发电学报》 EI CSCD 北大核心 2014年第3期239-245,252,共8页 Journal of Hydroelectric Engineering
基金 国家自然科学基金创新研究群体科学基金(51021004) 天津市自然科学基金(12JCZDJC29200) "十二五"国家科技支撑计划(2011BAB10B06)
关键词 水利工程施工 施工进度 实时监控 高堆石坝 回归分析 hydraulic engineering construction construction progress real-time monitoring high rock-filldam regression analysis
  • 相关文献

参考文献4

二级参考文献23

共引文献94

同被引文献48

引证文献7

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部