全工序同步平行施工技术在震后特长隧道中的应用

Application of Whole Process Synchronous Parallel Construction Technology on a Super Long Tunnel after Earthquake
下载PDF
导出
摘要 特长公路隧道采用传统的施工管理,工作效率低、施工工期长,造成施工成本提高。针对震后映秀特长隧道工期紧、地质条件差、施工繁琐的特点,采用全工序同步平行施工技术。通过严密管理、科学组织,该项施工技术得以顺利进行并取得显著效果,大大缩短工期、降低工程成本,为今后特长隧道施工提供经验借鉴。 The traditional construction management in super long road tunnels may lead to low work efficiency, long construction period and high construction cost. In view of distinguishing features of tight schedule, poor geological conditions and complex construction, the whole process synchronous parallel construction technology has been applied to the super long tunnels after earthquake. This construction technology has achieved remarkable goals due to overall and well-organized management. The construction period has been shortened and the construction cost has been reduced. It can provide experiences for reference in the similar projects.
作者 段巨才
出处 《石家庄铁路职业技术学院学报》 2014年第2期27-32,共6页 Journal of Shijiazhuang Institute of Railway Technology
关键词 特长隧道 全工序 同步平行施工 甘特图法 关键链法 super long tunnel whole process synchronous parallel construction gantt chart methodthe critical chain method
  • 相关文献

参考文献5

二级参考文献11

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部