摘要
工程变更管理是出现问题较多的管理环节。文章以西部管道公司引进ISRS-NaturalGas&Pipeline对工程变更管理活动进行评价为例,论述了基于风险识别的变更分类、建立标准化管理模板、加强对风险的识别及消减等提高工程变更管理的措施。
Engineering change management is the engineering management link that problems often occur. By taking the example of evaluation on engineering change management activities applying ISRS-Natural Gas Pipeline in China Petroleum West Pipeline Company, Ltd., this paper discusses improving engineering change management measures such as sorting engineering change based on risk identification,establishing standardization management pattern,enhancing risk identification and elimination.
出处
《石油工程建设》
2014年第3期85-87,共3页
Petroleum Engineering Construction
关键词
ISRS国际安全评级系统
变更管理
改进
International Safety Rating System(ISRS)
change management
improvement