摘要
通过分析两种不同的基坑降水设计方案 ,阐述了降水技术要求 。
Two different design schemes are analysed through excavation dewatering example.Dewatering technical requirement is expounded,and the measurement of differentid settlement around buildings is introduced.
出处
《水文地质工程地质》
CAS
CSCD
2001年第2期42-44,共3页
Hydrogeology & Engineering Geology