摘要
为满足国家环保部门要求的排放规定,某电厂对3台220t/h高温高压循环流化床锅炉烟气脱硫设施进行改造势在必行,介绍其电气工程可行性方案。
Ac cording to the emission regulations requirements of the State Environmental Protection Department, the transformation should be implement for desulfurization reduction of three 220t/h high temperature and high pressure circulat- ing fluidized bed boiler. The feasibility of power plant project is introduced.
出处
《自动化应用》
2014年第5期33-35,共3页
Automation Application
关键词
脱硫装置
保护控制
减排
电气系统
desulphurization installment
protection control
reduction
electrical system