摘要
深入分析了近几年辽宁省建成通车的部分隧道渗漏水病害问题,并有针对性地提出了预防措施和治理方法,为今后北方寒冷地区隧道防排水系统的设计、施工及管理提供参考。
Elaborate analysis is implemented on seepage damages of tunnels in Liaoning province opened in recent years, targeted preventive measures and treatment methods are proposed, references on waterproof and drainage system design, construction and management of tunnels of northern cold region are provided.
出处
《北方交通》
2014年第6期112-114,共3页
Northern Communications