摘要 晋煤集团长治仙泉煤业有限公司副斜井净断面积17.75m2,倾角6°,斜长2 985.2m,130~500m段下伏3号煤采空区。采空区厚度5.35~6.42m,平均5.5m,采深、采厚比为12.2~23.1。针对采空区情况,在井筒施工之前,采用水泥粉煤灰浆,先行对采空区进行地面注浆治理,以确保井筒施工和使用安全;而后采用掘进机掘进,安全顺利地通过了下伏采空区段,取得了预期效果。 A mine auxiliary inclined shaft of Changzhi Xianquan Anthracite Mining Company Limited , Jincheng Anthracite Mining Group had a net cross section area of 17.75m2 ,an inclination of 6° ,an in-clined length of 2 985.2m and a section from 130~500m above a goaf of No.3 seam.A thickness of the goaf was 5.35~6.42m ,an average thickness was 5.5m and a mining depth and mining thickness ratio was 12.2~23.1.According to the goaf condition ,before the construction of the mine inclined shaft ,a cement and fly ash grout was applied to a grouting treatment at the surface ground conducted in the goaf in order to ensure the safety construction and safety application of the mine inclined shaft.Then a mine inclined shaft was safely and successfully passed through the section above the goaf with the heading of the mine mechanized roadheader and with expected effects.
作者 胡志云
出处 《建井技术》 2014年第2期6-9,共4页 Mine Construction Technology
关键词 采空区 斜井施工 地面注浆 机械化作业 goaf construction of mine inclined shaft grouting at surface ground mechanized operation
  • 相关文献

参考文献4

二级参考文献20

共引文献537

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部