金属矿山巷道过泥化闪长岩断层掘进支护工艺

Heading and Support Technology of Metal Mine Roadway Passing Through Argillized Diorite Fault
下载PDF
导出
摘要 白象山铁矿-390m水平巷道施工中,需穿越泥化闪长岩断层破碎带,导水性明显,采用管棚法通过,地面注浆、工作面注浆与超前小导管注浆相结合的措施防治水,超前钻孔探明断层产状。施工时,先将巷道工作面后方5m范围内刷大并进行支护,用作管棚钻机钻场。然后利用液压钻机施工管棚和地质钻孔。钻探过程中,出现涌水及塌孔时,及时注浆,然后扫孔复钻,保证钻孔进入稳定岩层5m以上。地质钻孔和超前管棚施工完毕,施工至破碎带时,增加超前小导管注浆护顶工艺,与浅孔爆破、短段掘支相结合,安全顺利地通过了断层破碎带。 In a construction of a -390m level roadway in Baixiangshan Iron Mine ,the roadway had to pass through a broken zone of an argillized diorite fault with obvious water flow.A pipe shield method in combination with the measures of the surface grouting ,working face grouting and advance small guide tube grouting was applied to the water prevention and control and the fault status was proved with advance borehole drilling.During the construction operation ,the mine roadway behind 5m of the working face was enlarged and supported ,a pipe shield was applied to the drilling site and the pipe shield and geological drilling were conducted with a hydraulic drilling rig.During the drilling opera-tion ,when a water inflow and borehole collapsed occurred ,a grouting operation would be timely con-ducted and a borehole reaming and re-drilling operation would be conducted in order to ensure the borehole with a depth over 5m in the stable rock stratum.When the geological drilling and advance pipe shield construction completed and the construction was at the broken zone ,an advance small guide tube grouting and roof control technology was enhanced in combination with the a shallow borehole blasting and short sectional heading and support.The mine roadway was safety and successfully passed through the broken zone of the fault.
作者 刘宁
出处 《建井技术》 2014年第2期14-16,48,共4页 Mine Construction Technology
关键词 巷道 断层 泥化闪长岩 管棚法 注浆 mine roadway fault argillized diorite pipe shield method grouting
  • 相关文献

参考文献3

二级参考文献61

  • 1姜耀东,赵毅鑫,刘文岗,李琦.深部开采中巷道底鼓问题的研究[J].岩石力学与工程学报,2004,23(14):2396-2401. 被引量:335
  • 2付国彬.巷道围岩破裂范围与位移的新研究[J].煤炭学报,1995,20(3):304-310. 被引量:80
  • 3陆家梁.软岩巷道锚喷支护的适用性[J].光爆锚喷,1995(1):1-4. 被引量:3
  • 4翟新献,李化敏.深井软岩巷道围岩变形特性的研究[J].煤,1995,4(5):24-26. 被引量:12
  • 5钱七虎.非线性岩石力学的新进展--深部岩体力学的若干问题[A].中国岩石力学与工程学会.第八次全国岩石力学与工程学术大会论文集[C].北京:科学出版社,2004:10-17.
  • 6晏玉书.我国煤矿软岩巷道围岩控制技术现状及发展趋势[A].何满潮.中国煤矿软岩巷道支护理论与实践[C].徐州:中国矿业大学出版社,1996.1-17.
  • 7Gurtunca R G, Keynote L. Mining below 3 000 m and challenges for the South African gold mining industry[A]. In: Proceedings of Mechanics of Jointed and Fractured Rock[C]. Rotterdam: A. A.Balkema, 1998. 3 - 10.
  • 8Diering D H. Tunnels under pressure in an ultra-deep Wifwatersrand gold mine[J]. Journal of the South African Institute of Mining and Metallurgy, 2000, 100: 319-324.
  • 9Vogel M, Andrast H P. Alp transit-safety in construction as a challenge , health and safety aspects in very deep tunnel construction[J]. Tunneling and Underground Space Technology,2000, 15(4): 481-484.
  • 10Johnson R A S. Mining at ultra-depth, evaluation of alternatives[A].In: Proceedings of the 2nd North America Rock Mechanics Symposium[C]. Montreal: NARMS'96, 1996. 359 - 366.

共引文献2272

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部