HPS澄清池结构形式的优化分析

Optimization Analysis of the HPS Clarification Structure
下载PDF
导出
摘要 以"蒲城清洁能源化工有限责任公司渭北煤化工园区厂外供水净化工程"项目中的"HPS澄清池"的结构形式优化为背景,采用有限元分析软件MIDAS/Gen分别建立原方案和优化后方案HPS澄清池的结构模型,结合澄清池特殊的工艺要求和其结构所受荷载情况,分析比较两种模型静力和动力特征,总结在静力、动力作用下结构的受力特性、应力和变形的分布规律,为该工程结构计算与设计提供依据。 With the background of the structure optimization of the " HPS clarifier" in "the water purification project outside the plant of Weibei coal chemical industry park under the charge of Pucheng Clean Energy Chemical Industry Co.Ltd.",using finite element analysis software MIDAS/Gen,the structure models of HPS were established for clarification pool of original scheme and the optimized combination of clarifier.Combining with special process requirements and the structure of the load,the paper analyses and compares static and dynamic characteristics of two models,and summarizes the distribution principles of force characteristics,structure stress and deformation under the static,dynamic action,to provide a basis for the engineering structure calculation and design of the project.The structure of HPS clarifier is concrete,composed of pool wall,column,wall and various support components.The original scheme is slab column-shear wall structure,and the optimized scheme is frameshear wall structure.Through calculation and analysis,it is concluded that the optimized structure has been greatly improved in the bearing capacity and economic aspects.
出处 《杨凌职业技术学院学报》 2014年第2期40-44,共5页 Journal of Yangling Vocational & Technical College
关键词 HPS澄清池 反应谱分析 MIDAS/Gen软件 静力计算 HPS clarifier spectrum analysis MIDAS/Gen software static calculation
  • 相关文献

参考文献5

  • 1张引弟,刘世忠.新型澄清池结构的动力分析计算[J].山西建筑,2006,32(7):9-10. 被引量:3
  • 2GB50032-2003,中华人民共和国国家标准.室外给水排水和燃气热力工程抗震设计规程[S].
  • 3GB50010-2010,中华人民共和国国家标准,混凝土结构设计规范[S].
  • 4CECS138-2002,中国工程建设标准化协会标准,给水排水工程钢筋混凝土水池结构设计规程[S].
  • 5GB50009-200l,中华人民共和国国家标准,建筑结构荷载规范[S].

二级参考文献2

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部