摘要
东露天煤矿岩石半连续系统进入调试生产关键期,保障排土机正常排弃作业空间是确保系统能力充分发挥的必要条件。针对排土机前一幅下排空间受限条件下进行排土方式优化,得出前期排土机作业最优方案。
Rock semi continuous system enters the debug production key period in east open-pit coal mine.To guarantee dumping machine normal discharge working space is a necessary condition to ensure that the system capacity brings into full play.This article gets the optimal scheme of early dumping machine operation aiming at optimizing the dump mode under dumping machine before a row space discharge space constrained conditions.
出处
《露天采矿技术》
CAS
2014年第6期1-4,共4页
Opencast Mining Technology
关键词
排土机
作业方式
优化
dumping machine
operation mode
optimization