摘要 北京地铁8号线二期盾构长距离下穿老旧平房群施工,在不具备平房拆迁和地面加固的条件下,通过严格落实盾构施工技术管理措施,信息化、精细化管理,有效控制了施工对地层的扰动,基本满足了房屋变形控制指标,对类似下穿施工有一定的借鉴意义。 It was required to cross old single-storey building complex with long-distance shield construction for phase-2 project of Beijing Metro Line 8. With no demolition of the houses and ground reinforcement conditions, disturbance of shielding on the formation was effectively controlled through strict implementation of technical measures and management of shield construction, information technology and sound management. Shield construction basically meets the requirements of the deformation control indexes of houses. The technology can be taken as a guidance for similar projects in construction.
作者 陈浩
出处 《都市快轨交通》 北大核心 2014年第3期81-83,99,共4页 Urban Rapid Rail Transit
关键词 盾构 长距离下穿 老旧平房群 变形控制 监测分析 shield long distance crossing old single-storey building complex deformation control monitoring analysis
  • 相关文献

参考文献7

二级参考文献19

  • 1张国京.北京地区土压式盾构刀具的适应性分析[J].市政技术,2005,23(1):9-13. 被引量:43
  • 2乐贵平.φ6.14m加泥式土压平衡盾构掘进机引进技术总结[A]..北京市政集团技术资料[C].,2002-09..
  • 3侯景岩.北京地区浅层地下水的分布与地下铁道隧道工程施工方法选泽[A]..中国土木工程学会隧道与地下工程学会第十四届学术交流会论文集[C].北京:中国科学技术出版社,2000-12..
  • 4杜文库 闻永和.北京地铁五号线盾构实验段工程盾构法施工概述[A]..中德隧道(盾构)技术研讨会资料之四[C].,2002-06..
  • 5乐贵平(执笔人).亮马河北路污水隧道盾构法施工技术研究[A]..(北京市科委科研项目技术鉴定资料)[C].北京市政集团,2000-08..
  • 6土木学会.隧道标准规范(盾构篇)解释(日文版)[M].,1997—05..
  • 7[1]Japanese Standard for Shield Tunneling [Z]. Tokyo Japan:Japan Society of Civil Engineers, 1996.
  • 8[2]小泉淳,等.シ-ルド工法の调查·设计から施工まで[M].日本东京都:地盘工学会,1997.
  • 9[3]远藤浩三,等.土压系シ-ルド工法[M].日本东京都:鹿岛出版会,1982.
  • 10[4]矢野信太郎.シ-ルド工法.[M].日本东京都:鹿岛出版会,1980.

共引文献96

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部