摘要
场地平整土石方为一动态平衡过程,其受设计输入、设计和施工等多方面因素的影响。论文分析了7个因素对土石方量计算的影响,进行了综合评价,并对部分因素提出了控制方案。
Field leveling earthwork is a dynamic balance process and is affected by many factors, design input, design and construction etc. This paper analyzes the impact of the seven factors of earthwork calculations, carried out a comprehensive evaluation, and some of the factors proposed control scheme.
出处
《工程建设与设计》
2014年第7期151-153,共3页
Construction & Design for Engineering
关键词
动态平衡
土石比
松散系数
回填质量
经济风险
dynamic balance
soil rock ratio
loose coefficient
backfill quality
economic risk