摘要
北京地铁10号线是北京市第二条地铁环线,线路分两期建设。一期与二期在劲松站后贯通施工涉及土建结构、轨道、供电等共13个专业。本文主要介绍了劲松站后轨道专业一、二期贯通改造施工的组织方案,其他设备专业在轨道专业施工过程中穿插进行。通过对此工程的介绍为国内其他类似施工提供了可借鉴的施工经验。
Beijing Subway Line 10 is the second subway loop line constructed in two phases. Civil structure, rail, power supply etc., atotal of 13 majors are involved in phase Ⅰ and phase Ⅱ post-Jinsong statism engineer, ring. This paper mainly introduces the transfixion transformation construction organization program of phase Ⅰ and phase Ⅱ post-Jinsong station, and other equipments installation and tunnel construction will be done in turn. We aim to provide some similar projects with references by introducing this project.
出处
《价值工程》
2014年第22期146-149,共4页
Value Engineering
关键词
既有线
贯通接轨
施工组织
existing line
transfixion
construction organization