期刊文献+

高压旋喷桩在建筑垃圾填埋区的工程实例

The High Pressure Jet Grouting Pile Engineering Examples in the Construction Waste Landfill Area
下载PDF
导出
摘要 工程建造于废弃的采石场,采石场留下较大的采石坑,坑中填充了各种建筑垃圾和生活垃圾。原设计采用冲孔灌注桩作为工程的基础桩,由于场地内存在小范围的土洞,开始施工冲孔灌注桩时就发生了严重的塌孔事故。改用高压旋喷桩地基处理的基础方案达到了良好的效果。就此讨论了在此类建筑垃圾填埋区域进行高压旋喷桩地基处理的整个流程。对试桩过程、设计参数取用、施工过程和检测过程中应注意的问题进行了研究和讨论。 The engineering construction in the abandoned quarry,quarry left large quarries,pit filled with all sorts of construction waste and household refuse.The original design using punching as the basis of engineering pile,due to the existence of a small scale soil caves in field,when punching pile construction a serious down hole accidents took place. To switch to foundation treatment of the high pressure j et grouting pile foundation scheme achieved good effect.This paper discussed the whole process of high pressure j et grouting pile foundation treatment.Process of test pile,design parameters,construction process and testing process were studied.
作者 凌海
出处 《建材世界》 2014年第3期122-126,共5页 The World of Building Materials
关键词 高压旋喷桩 地基处理 检测 建筑垃圾 复合地基 high pressure j et grouting pile foundation treatment detection construction waste composite foundation
  • 相关文献

参考文献5

  • 1龚晓楠.复合地基设计和施工指南[M].北京:人民交通出版社,2003.
  • 2刘永超.地基处理实用技术[M].北京:中国铁道出版社,2005.
  • 3GB5007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002.
  • 4GB50202-2002,建筑地基基础施工质量验收规范[S].北京:中国建筑工业出版社,2001.
  • 5.JGJ79-2002建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002..

共引文献163

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部