期刊文献+

基于AdaBoost算法的接触网定位器识别 被引量:9

Identification of OCS Locator Based on AdaBoost Algorithm
下载PDF
导出
摘要 接触网检测是保证电气化铁路接触网可靠运行的一项重要工作,其中定位器就是接触网系统中一个重要的组成部分,因此如何快速确定出定位器的位置便成了检测工作的基础。针对以上问题,文中提出了一种基于直线检测与AdaBoost算法的定位器识别方法。由于接触网支柱及腕臂等零部件均具有明显的直线特性,因此文章的主要思想便是通过Hough变换来对采集到的接触网图像中的直线特征进行提取,然后根据AdaBoost算法在目标识别方面的功能,首先找出能够代表支柱的直线,根据支柱的位置缩小检测的范围,从而进一步确定定位器在图中的位置。 Overhead Contact System (OCS)inspection is very important to insure the reliable operation of electric rail-way,and the locator is a key part of the OCS.Therefore,rapidly confirming the position of locator is the basis of OCS inspection.In this paper,a locator identification method based on lines detecting and AdaBoost algorithm is presented. As the parts such as OCS posts and cantilevers possess obvious linear characteristic,by Hough transformation,linear characteristic in OCS images can be extracted,then according to the function of AdaBoost algorithm on object identifica-tion,firstly the straight line standing for the post is found out,finally the inspection scope is diminished as per the post location,thus the position of locator in the drawing is further confirmed.
出处 《高速铁路技术》 2014年第3期9-12,共4页 High Speed Railway Technology
基金 中国铁路总公司科技研究开发计划(2013J010-B)
关键词 HOUGH变换 ADABOOST算法 支柱识别 定位器识别 Hough transformation AdaBoost algorithm post identification locator identification
  • 相关文献

参考文献6

二级参考文献34

共引文献77

同被引文献164

  • 1王立新,刘彤宇,李阳.SSDA图像匹配算法的研究及实现[J].光电技术应用,2005,20(3):53-55. 被引量:37
  • 2青莉,高晓蓉.线阵CCD摄像技术在接触导线磨耗检测中的应用[J].机车车辆工艺,2005(4):30-32. 被引量:4
  • 3李丰良,粟谦,孙焰.接触网的力学模型及运动微分方程[J].长沙铁道学院学报,1996,14(2):90-93. 被引量:18
  • 4彭朝勇,高晓蓉.国外接触网导线磨耗检测系统[J].中国铁路,2007(4):66-68. 被引量:10
  • 5STANDARDIZATION E C F E. EN50318 collection systems-validation of simulation dynamic interaction between pantograph and contact line[ S]. Brussels: 2002.
  • 6KIESSLINGF,PUSCHMANNRSCHMIEDERA,etal.电气化铁道接触网[M].中铁电气化局集团有限公司,译.北京:中国电力出版社,2004:163-166.
  • 7WU T X, BRENNAN M J. Basic analytical study of pantograph-catenary system dynamics [ J J. Vehicle System Dynamics, 1998, 30(6) : 443-456.
  • 8WU T X, BRENNAN M J. Dynamic stiffness of a railway overhead wire system and its effect on pantograph catenary system dynamics[J]. Journal of Sound and Vibration, 1999, 219(3) : 483-502.
  • 9LOPEZ-GARCIA O, CARNICERO A, TORRES V. Computation of the initial equilibrium of railway overheads based on the catenary equation[ J]. Engineering Structures, 2006, 28(10) : 1387-1394.
  • 10LEE J H, PARK T W. Developmem of a three- dimensional catenary model using cable elements based on absolute nodal coordinate formulation[J]. Journal of Mechanical Science and Technology, 2012, 26 (12) : 3933-3941.

引证文献9

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部