期刊文献+

梨园坝煤矿水源热泵系统研究 被引量:2

Research on Water Source Heat Pump System of Liyuanba Colliery
下载PDF
导出
摘要 水源热泵系统由于具有高效节能的优点而被广泛应用,而煤矿工程中的水源热泵系统更是充分利用了矿井水这种良好水源。结合地处夏热冬冷地区的重庆梨园坝煤矿工程实例进行分析,测试得到机组夏季能效比为6.40,冬季能效比为4.26,其值比《公共建筑节能设计标准》所规定的标准值高出约48.8%,其节能性对于推广水源热泵系统在煤矿工程中的应用具有一定价值。 Due to energy efficiency, water source heat pump system has been widely applied, and the application of that in colliery makes full use of the mine water, which is a good kind of water source. An actual project of Liyuanba Colliery in Chongqing, located in hot summer and cold winter zone, was analyzed. Actual measurement shows that the Coefficient of Performance (COP) in summer is 6.40, and COP in winter is 4.26, which is approximately 48.8%higher than the standard value given by “Design standard for energy efficiency of public building”, and the high efficiency of this system will enhance the application of water source heat pump system in collieries.
出处 《制冷与空调(四川)》 2014年第3期340-343,357,共5页 Refrigeration and Air Conditioning
关键词 水源热泵 煤矿 矿井水 能效比 water-source heat pump colliery mine water COP
  • 相关文献

参考文献7

二级参考文献23

共引文献51

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部