摘要
通过分析近年北江干流河床下切和芦苞水闸的运行情况,分析了经芦苞水闸进入九曲河、白坭河的水量变化,通过九曲河历史分流量变化分析,论证工程从北江干流向花都引水的合理性。
By means of studing Beijiang riverbed undercutting in recent years and the operation of Lubao sluices , the amount of wa-ter change into the Jiuqu river and Baini river by the Lubao sluice has been analyzed .Through analyzing of river flow changes , the rationality of engineering intake water from Beijiang river has been verified .
出处
《广东水利水电》
2014年第3期45-47,共3页
Guangdong Water Resources and Hydropower
关键词
水资源论证
取水合理性分析
water resources assessment
rationality analysis