摘要
结合某地铁区间无柱雨棚托换工程实例,介绍了托换体系的选择、被动托换体系的设计、施工及监测相关内容,以期为相关工程提供一定的借鉴。
This paper presents a case study of the underpinning of a no column canopy in a regional metro construction. The selectionof underpinning and passive underpinning systems, construction technique and monitoring are also introduced in the paper.
出处
《土工基础》
2014年第3期35-37,51,共4页
Soil Engineering and Foundation
关键词
地铁
托换体系
无柱雨棚
被动托换
隧道
监测
Metro Construction
Underpinning System
No Column Canopy
Passive Underpinning
Tunnels
Monitoring