摘要 地下连续墙工法的广泛应用使得深基坑技术日益成熟,特别是在地质条件恶劣区域。以复杂地层情况下地下连续墙施工实例为背景,介绍地下连续墙施工过程中难点及注意事项。同时,在基坑开挖阶段对地下连续墙实时监测,对监测数据进行适当地处理,反映地下连续墙变形的实际情况。结合地下连续墙变形监测数据,表明该工法的应用效果良好,期望能对类似工程有一定的参考。 The application of underground slurry wall in the deep excavation projects results in a better performance of excavation supporting system, especially, for deep excavations under the complicated subsurface conditions. In the practical applications, the slurry wall construction technique should allow slight modifications in order to fit for the specific subsurface conditions. The key as well as most difficultaspects of the slurry construction methods are introduced in this paper through a case history. The construction monitoring should be performd and the monitoring data should be processed so that the deformation of the slurry wall can be presented. The construction monitored data indicate that the application of slurry wall method in the deep excavation support is a success.
出处 《土工基础》 2014年第3期45-48,共4页 Soil Engineering and Foundation
关键词 复杂地层 地下连续墙 施工 变形监测 Complicated Subsurface Conditions Slurry Walls Construction Phase Deformation Monitoring
  • 相关文献

参考文献4

二级参考文献23

共引文献36

同被引文献7

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部