某地铁隧道工后沉降稳定性判断研究 被引量:1

Analysis the Post Construction Settlement of a Metro Tunnel
原文传递
导出
摘要 地铁隧道建设规模不断扩大,工程建设期间经常需要判定工后沉降是否稳定,其关系到后期设备安装等工期计划。工程实践中常采用理论公式法、经验推算预测法及数值分析等方法。根据某地铁明挖隧道实例,采用上述三种方法判断研究工后沉降稳定问题,为合理安排工程筹划提供参考。 In the metro construction practice, it is often required to predict the post construction settlement magnitude duringthe construction. A stable post construction settlement is critical for the scheduling of the equipment installation and others.Three methods are often used:theoretical method; empirical method; and numerical analysis method. This paper presents theresults of all three methods. A decision of whether a stable post construction settlement can be obtained was made based onthree settlement prediction results.
作者 陈星
出处 《土工基础》 2014年第3期103-105,共3页 Soil Engineering and Foundation
关键词 地铁隧道 工后沉降 理论公式法 经验推算预测法 数值分析法 Metro Tunnel Post Construction Settlement Theoretical Method, Empirical Method Numerical Analysis
  • 相关文献

参考文献5

  • 1Hulme T W, Shirlaw J N, Hwang R N. Settlements During Underground Construction of the Singapore MRT[C]// Pro- ceeding 10^th Southeast Asian Geotechnical Conference. Taipei: Special Taiwan Session, 1990 : 521-526.
  • 2Shirlaw J N. Observed and Calculated Pore Pressure and De- formations Induced by an Earth Balance Shield:Discussion[J]. Canadian Geotechnical Journal, 1995,32 : 181.
  • 3中华人民共和国住房和城乡建设部.建筑地基处理技术规范(JGJ79-2012)[s].北京:中国建筑工业出版社,2012.
  • 4[日]地盘工学会.盾构法的调查设计施工[M].北京:中国建筑工业出版社,2008.
  • 5中华人民共和国住房和城乡建设部,中华人民共和国国家质量监督检验检疫总局.建筑地基基础设计规范(GB50007-2011)[S].北京:中国建筑工业出版社,2011.

共引文献8

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部