期刊文献+

高速铁路轨道基准点(GRP)平面测量数据处理研究 被引量:1

Study on Data Processing of GRP on High-speed Railway by Plane Surveying
原文传递
导出
摘要 为解决大跨度连续梁、连续钢构、系杆拱等结构物受温度变化及线路振动影响轨道控制网(CPⅢ)变化,进而影响轨道基准点(GRP)平面测量数据处理,该文采用直接提取轨道基准点(GRP)平面观测的CPⅢ坐标数据,建立虚拟测站,形成边角网观测数据,采用自由网平差和约束网平差进行轨道控制网(CPⅢ)数据处理。结合具体测量实践,发现可以极大的提高轨道基准点(GRP)数据处理效率。 In order to solve the influence of temperature change and line vibration on large span continuous cantilever beam bridge ,continuous rigid frame bridge and tie-bar arch bridge structure which effects track control network (CPⅢ) changes, and effects data processing in track reference point (GRP) plane surveying. This paper extracts the CP Ⅲ coordinate data of track reference point (GRP) in surveying plane directly, establishes the virtual station, formats triangular network observation data, and uses the free net adjustment and constraint net adjustment for data processing in track control network (CPⅢ ). According to practice ,the efficiency of track reference point (GRP) data processing is improve greatly.
作者 高小兵
出处 《勘察科学技术》 2014年第3期15-17,51,共4页 Site Investigation Science and Technology
关键词 轨道基准点 平面测量 数据处理 GRP plane surveying data processing
  • 相关文献

参考文献4

  • 1高速铁路工程测量规范(TB10601-2009).
  • 2张银虎,李书亮,余鹏,等.轨道基准点(GRP)在CRTSI型板式无砟轨道施工中的应用.见:岑敏仪.高速铁路精密测量理论及测绘新技术应用国际学术研讨会论文集.成都:西南交大出版社,2010.252-257.
  • 3任晓春,王世君.郑西客专大跨连续梁CPIII点坐标变化解决方案.见:岑敏仪.高速铁路精密测量理论及测绘新技术应用国际学术研讨会论文集.成都:西南交大出版社,2010.227-230.
  • 4赵梦杰,刘成龙,王化光,黄志伟.CPⅢ平面网半盘位观测的可行性研究与分析[J].铁道工程学报,2011,28(1):20-24. 被引量:6

二级参考文献5

共引文献11

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部