摘要
四川省阿坝州晴朗水电站在引水隧洞施工中不断总结不良地质洞段的施工经验,项目管理部不定期组织各单位相互交流学习,确保顺利通过不良地质洞段的施工质量和安全,并且节约施工成本,取得了较好的效果。
Construction experience of poor geological tunnel section is constantly summarized in water diversion tunnel construction for Sichuan Aba Qinglang Hydropower Station. Project management department irregularly organizes all units for mutual exchange and study,thereby ensuring construction quality and safety of poor geographic tunnel section,saving construction cost,and achieving better effect.
出处
《中国水能及电气化》
2014年第6期12-14,共3页
China Water Power & Electrification
关键词
隧洞
不良地质洞段
施工注意事项
tunnel
poor geographic tunnel section
construction precautions