摘要
峡江水利枢纽工程泄水闸弧形闸门结构施工和设计都比较复杂,安装工艺流程繁琐,外界不利因素较多,并且对各部位的安装精度要求很高。结合实际制定了简捷可行的施工方案,施工组织细致,达到每个环节的安装精度要求。
The construction and design of the radial gate structure for Xiajiang Hydro-junction Sluice is more complex, the installation process is complicated,and the construction has a lot of influence factors, furthermore the gate has a high accuracy requirements. Combining with the feasible construction scheme and carefully organization for the construction, the installation accuracy requirements for each step is obtained.
出处
《施工技术》
CAS
北大核心
2014年第12期29-31,34,共4页
Construction Technology
关键词
水利枢纽
泄水闸
弧形闸门
安装
hydro-junction
sluice
radial gate
installation