摘要
由于在闸门安装前,启闭机轨道梁和立柱之间的连接梁已经形成,造成闸门无法用起重设备直接吊装就位,给闸门安装带来极大困难。潮州拦河闸工作闸门充分利用现有建筑结构作辅助,借助自制的拖架把闸门拖动到孔口,用启闭机安装就位。
Before the gate installation, the connecting beams between close machine rail beam and column has formed,so the gate cannot use crane to hoist directly in place. There is great difficulties for the gate to install. Chaozhou Sluice gate makes full use of the existing building structure as auxiliary, then the hoisting in place is successful finished with self-made trailer to drag the orifice gate.
出处
《施工技术》
CAS
北大核心
2014年第12期32-34,共3页
Construction Technology
关键词
闸门
安装
方案
应用
gate
installation
scheme
application