期刊文献+

大型综放液压支架快速搬运技术研究 被引量:5

Research on Rapid Carrying Technology of Larger Synthetical Support
下载PDF
导出
摘要 为了提高煤矿井下综放液压支架搬运效率,在对煤矿井下支架搬运情况分析的基础上,结合工程(IE)技术,应用其搬运技术,通过对支架组装流程和搬运流程分析,提出了大型综采液压支架的快速搬运方法。该方法有效保证支架搬运的高效性与安全性,缩短工作面安装工期,降低成本,提高生产效益。 To enhance the efficiency of carrying fully-mechanized sublevel synthetical support, a new technology model was put forward. Basis on the analysis of the condition of carrying synthetical support and Industrial Engineering, through the analysis of the assembly process and carrying process, we proposed the rapid carrying technology of larger synthetical support. This method can effectively guarantee high efficiency and safety, shorten the time of installation time, reduce costs and improve production efficiency.
出处 《煤矿机械》 北大核心 2014年第6期196-197,共2页 Coal Mine Machinery
关键词 综放支架 快速搬运 组装流程 搬运流程 fully-mechanized sublevel synthetical support rapid carrying assembly process handling process
  • 相关文献

参考文献4

二级参考文献11

同被引文献23

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部