摘要
本文选用MDEA技术,基于AspenPLUS与EDR软件对新疆喀什某能源企业15×104m3/d天然气脱碳装置进行了流程模拟计算与主要设备选型计算,确定了该工程优化的设计方案。初步经济评价计算表明,该工程总投资较低,年利润较高,投资回收期短。
On the base of the AspenPLUS with EDR software, the simulation calculation and the main equipment selection calculation of a 15×10^4m^3/d of natural gas decarbonizafion device for energy companies in Kashgar were carried out on the selection of MDEA technology, to detelmine the optimized design of the project. Preliminary economic evaluation calculations show that the total investment of the project is low, annual profit is higher, and the payback period is short.