期刊文献+

国道318线二郎山西口至康定县城沿线地质灾害发育特征及治理对策 被引量:7

Distribution and development law of geological hazards beside the line from Erlang Mountain to Kangding Town in the No.318 National Road
下载PDF
导出
摘要 在川藏公路关键段二郎山西口至康定县城长74km的范围内,共发育滑坡34处、崩塌33处、泥石 流43处,其发育密度分别达0.46,0.44和0.58个(条)/km。分析表明,上述地质灾害的分布与该地所赋存 的地形地貌、地质构造及岩性条件等密切相关。 Comprehensive investigation and systematic research on the geological hazards beside the line from Erlang Mountain to Kangding Town have beeen conducted. It has been found that there are 34 landslides, 33 rockfalls and 43 debris flows occurred on 74km long slopes along the No.318 National Road from Erlang Mountain to Kangding Town. The average linear densities of landslide, fockfall and debris now are 0.46, 0.44 and 0.58/km respectively. Through investigation, it is evident that these geological hazards are correlated with the stratum rock property, geological structure and topographic change.
作者 胡卸文
出处 《自然灾害学报》 CSCD 北大核心 2001年第1期65-68,共4页 Journal of Natural Disasters
基金 中国科学院东川泥石流观测站开放研究基金项目!(1999-2)
关键词 国道318线 地质灾害 发育规律 治理 地形 地质构造 岩性 No.318 National Road, geological hazard development regularity
  • 相关文献

参考文献5

  • 1刘汉超 陈明东 等.金沙江向家坝水电站库区环境地质评价[M].成都:成都科技大学,1993.18-50.
  • 2胡卸文,黄润秋,徐志文.澜沧江某电站岩体质量分类中的力学参数选取探讨[J].工程地质学报,1996,4(2):7-13. 被引量:5
  • 3胡卸文,工程地质学报,1995年,4卷,2期,7页
  • 4刘汉超,金沙江向家坝水电站库区环境地质评价,1993年,18页
  • 5吴积善,云南蒋家沟泥石流观测研究,1990年,165页

二级参考文献3

  • 1吴立新,工程岩体分类,1993年
  • 2聂德新,古风化岩及砾砂岩工程地质特性研究,1993年
  • 3严沛漩,水利水电工程勘测设计专业综述.工程地质,1993年

共引文献4

同被引文献60

引证文献7

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部