摘要
本文主要对测量仪器、施工环境以及测量工作中事前、事中、事后控制等各个环节对测量工程师的职责要求进行论述。
This article discussed about the measurement instrument, the construction environment, measuring work before, during, after the control measurement engineers to do the work were discussed.
出处
《中国非金属矿工业导刊》
2014年第3期60-61,共2页
China Non-Metallic Minerals industry
关键词
测量环境
测量方案
施工设计
事后控制
measurement environment
measurement program
construction design
later control