期刊文献+

长春市新立城水库除险加固工程土坝基础防渗处理浅析 被引量:4

Changchun new earth dam foundation seepage control and reinforcement dam reservoir project processing
下载PDF
导出
摘要 长春市新立城水库位于伊通河中上游,位于长春市东南16km。2007年水利部大坝安全管理中心评定:新立城水库为Ⅲ类坝,建议进行除险加固。根据新立城水库土坝基础的渗漏及地质情况,对坝基进行了高压摆喷的工程处理措施。 Xinlicheng Reservoir in Changchun City is located in the upper reaches of Yitong River, and in southeast 16 km of Changchun City. In 2007,Dam Safety Management Center of the Ministry of the Water Resources assessed Xinlicheng Reservoir as class Ⅲ dam,and proposed to eliminate the danger and make the reinforcement. According to leaks and geological conditions in Xinlicheng earth dam foundation, the high pressure spray treatments are put on dam foundation.
出处 《长春工程学院学报(自然科学版)》 2014年第2期73-75,116,共4页 Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词 新立城水库 土坝基础处理 高喷防渗墙 Xinlicheng Reservoir dam foundation treatment high pressure cutoff
  • 相关文献

参考文献5

  • 1SL 274-2001碾压式土石坝设计规范[S].北京:中国水利水电出版社,2001.
  • 2SL 2584-2000水库大坝安全评价导则[S].北京:中国水利水电出版社,2000.
  • 3DL/T 54182012水工建筑物水泥灌浆施工技术规范[S].北京:中国电力出版社,2012.
  • 4DL/T 5200-2004水利水电工程高压喷射灌浆技术规范[S].北京:中国电力出版社,2004.
  • 5顾淦臣,陈明致.土石坝设计[M].北京:中国工业出版社,1963.

同被引文献12

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部