期刊文献+

沙角A电厂300MW机组锅炉连排系统优化改造 被引量:3

The optimization and transformation to 300MW unit boiler continuous blow down system in Shajiao A power station
下载PDF
导出
摘要 沙角A电厂二期#4、#5机300MW机组的锅炉连续排污系统存在系统流量难控制、阀后弯头经常吹损的现象,经过对系统深入分析,属于阀门选型不符合系统设计要求所致,并据此提出优化改造方案,实施后上述问题得到圆满解决。 The boiler continuous blow down systems in Boilers # 4,5 300 MW units in Shajiao A Power Station Ⅱ exist some phenomena as difficult to control flow system, often blowing loss in angle head behind the valve. Through in-depth analysis of the system,the reason belongs to that valve selection system design does not meet the requirements. According to this, the optimization and transformation have been proposed. After the implementation the above issues have been satisfactorily resolved.
作者 谭禹 于雷
出处 《长春工程学院学报(自然科学版)》 2014年第2期76-78,90,共4页 Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词 锅炉连排系统 调节阀 弯头 boiler continuous blow down system regulating valve angle head
  • 相关文献

参考文献1

共引文献1

同被引文献37

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部