下穿既有地铁盾构区间的矿山法隧道核心土优化分析 被引量:9

Optimization Analysis of Core Soil of Mined Tunnel Crossing under the Existing Shield Tunnel
下载PDF
导出
摘要 在穿越工程中,通常采用预留核心土技术控制隧道开挖过程中掌子面的稳定和变形。结合北京地铁6号线下穿既有盾构区间的矿山法隧道施工实例,对预留核心土的纵向长度和横向尺寸效应进行优化分析。研究结果表明:掌子面稳定性与其核心土高度成正比,而核心土纵向长度取0.5倍洞跨、上下底宽度比为2/3时利于掌子面稳定,其结论可供类似工程参考。 Technology of core soil was used to maintain excavation face stability and deformation during crossing engineering. Based on the engineering practices of beijing subway NO. 6 line with the mine tunneling method undererossing the existing shield interval of NO. 4 subway line. Optimiazation analysis of core soil of longitudinal length and horizontal size effect has been studied. The study show that the stability of core soil was proportional to it' s height, the reasonable longitudinal length was 0.5 times tunnel span and the ratio of top and bottom width was 2/3. The conclusion provides a good reference to similar works.
作者 宗长江
出处 《公路工程》 北大核心 2014年第3期29-33,共5页 Highway Engineering
基金 国家科技支撑计划(2012BAG05B00) 河北省高等学校自然科学青年基金项目(2011250)
关键词 盾构区间 下穿 矿山法 核心土 优化 shield interval undercrossing mine tunneling method core soil optimizaton
  • 相关文献

参考文献10

二级参考文献62

共引文献310

同被引文献64

引证文献9

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部