摘要
公路隧道下方有过水隧道穿越,隧道的开挖卸荷必然会对既有过水隧道产生影响。某高速公路隧道K21+450~480段下方有过水隧道穿越,本段隧道为小净距隧道,处在软弱Ⅴ级围岩中。本文通过数值计算,从位移、弯矩、应力等几个方面探讨了过水隧道的稳定性。
A water tunnel cross the road tunnel from below, tunnel excavation unloading will inev- itably impact on the water tunnel. An expressway tunnel is crossed by a water tunnel from below in the K21 +450 -480 period, this section of the tunnel is the small clear distance tunnel in weak V level of surrounding rock. This paper discusse the stability of water tunnel from displacement,bending moment and so on stress through numerical calculation.
出处
《公路工程》
北大核心
2014年第3期314-316,330,共4页
Highway Engineering
关键词
隧道
过水隧道
穿越
软弱围岩
稳定性
tunnel
water tunnel
crossing
the weak rock
stability