针对乌江渡发电厂一号厂机组AGC功能投入运行后合格率偏低问题做出具体分析,提出了提高AGC合格率的具体解决方法。
This paper detailedly analyzed the problem of low qualification rate after the Wujiangdu power plant no. 1 unit AGC function was put into operation, and proposed the specific solution to improve the AGC qualification rate.
出处
《贵州电力技术》
2014年第6期20-23,共4页
Guizhou Electric Power Technology
关键词
AGC
组合振动区
AGC
combination vibration area.