摘要
结合麦盖提连接线特大桥施工实例,针对桥梁的下部结构施工环节而展开探讨,详细地介绍了桩顶与系梁、桥梁墩柱、桥台以及盖梁施工技术,可为同类工程提供参考借鉴。
Combined with the extra large bridge at Markit connecting line, the paper discusses construc- tion process of infrastructure of the bridge, detailedly introduces the construction technology of the pile top and collar beam, bridge pier, abutment and capping beam, which can provide reference for similar projects.
出处
《交通标准化》
2014年第12期106-108,共3页
Communications Standardization
关键词
桥梁施工
下部结构
桥梁墩柱
盖梁施工
bridge construction
infrastructure
bridge pier
capping beam construction