多条件约束下电网建设项目全过程闭环管控对策研究 被引量:1

Study on Countermeasures for Closed Loop Management and Control in the Overall Process of Power Grid Construction Projects with Multi-constraints
下载PDF
导出
摘要 电网建设项目具有投资大、工期长的特点,受制于多重约束条件。研究并提出了多约束条件下电网建设各环节的合理工期,对国网金华供电公司近几年重要的电网建设项目进行了分析,研究了影响电网建设项目工期的关键因素,提出了多条件约束下电网建设项目全过程闭环管控对策。 Power grid construction projects are featured with large investment, long period and multi-constraints. This paper investigates and presents reasonable limit of every segment of power grid construction projects with multi-constraints and analyzes important power grid construction projects of Jinhua Power Supply Company in recent years; it studies key factors influencing duration of power grid construction projects. Finally, overall process management and control countermeasures for power grid construction projects with multi-constraints are proposed.
出处 《浙江电力》 2014年第6期56-59,共4页 Zhejiang Electric Power
关键词 电网建设 闭环管控 对策 多条件约束 全过程管理 power grid construction closed loop management and control countermeasures multi-con-straints overall process management
  • 相关文献

参考文献6

二级参考文献30

共引文献98

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部