期刊文献+

电力项目利用民间资本的模式研究 被引量:1

A Study on the Patterns of Privately Financing in the Power Industry
下载PDF
导出
摘要 利用民间资本可以解决电力项目(发电厂、输电网、配电网)的资金问题和提高管理效率,但需要研究利用民间资本模式的问题。通过分析电力供应系统的构成,电力项目利用民间资本的模式可以分为6种:独立发电厂、商业发电厂、独立输电网、商业输电网、独立配电网和产销相结合模式。结合案例,分析每种模式的关键成功要素以及相关的电价设计,可供政府和企业参考。 Private finance or non-government capital can help to solve the financing problem and improve the administrative efficiency of power industrial projects (e. g. , power plants, transmis- sion networks, distribution networks), but it is of necessity to study the financing patterns. By analyzing the constitution of power supply system, this paper argues that 6 models can be applied to power industrial projects, namely, independent power plants, merchant power plants, inde- pendent transmission systems, merchant transmission systems, independent distribution networks, and power generation and distribution franchises. On the basis of detailed case analyses, this paper also investigates critical factors of each of the models and the tariff design of electricity. The findings would be helpful for both the government and private investors.
作者 叶苏东
出处 《北京交通大学学报(社会科学版)》 CSSCI 2014年第3期22-28,共7页 Journal of Beijing Jiaotong University(Social Sciences Edition)
基金 国家自然科学基金项目"BT模式开发城市轨道交通项目的偿付机制研究"(71171017)
关键词 电力行业 融资策略 关键成功要素 电价设计 PPP power industry financing strategy critical successful factors tariff design PPP
  • 相关文献

参考文献13

  • 1YE S,LIU Y.Study on Development Patterns of Infrastructure Projects[J].Journal of Construction Engineering and Management,2008,134(2):94-102.
  • 2TIONG R L K.YEO K T,MCCARTHY S C.Critical Success Factors in Winning BOT Contracts[J].Journal of Construction Engineering and Management,1992,118(2):217-228.
  • 3TIONG R L K.CSFs in Competitive Tendering and Negotiation Model for BOT Projects[J].Journal of Construction Engineering and Management,1996,122 (3):205-211.
  • 4ZHANG X.Critical Success Factors for Public-Private Partnerships in Infrastructure Development[J].Journal of Construction Engineering and Management,2005,131(1):3-14.
  • 5ALBERT P C.Chan; Patrick T.I.Lam; Daniel W.M.Chan,Esther Cheung; and Yongjian Ke.Critical Success Factors for PPPs in Infrastructure Developments:Chinese Perspective[J]Journal of Construction Engineering and Management,2010,136 (5):484-494.
  • 6Zhen-Yu Zhao,Jian Zuo,George Zillante,et al.Critical Success Factors for BOT Electric Power Projects in China:Thermal Power versus Wind Power[J].Renewable Energy,2010,35:1283-1291.
  • 7YE S,LIU Y.Major Pitfalls in Developing Independent Power Projects[C]//Proceedings of 2007 International Conference on Construction and Real Estate Management,21-22 August 2007,Bristol (UK):349-354.
  • 8YE S,TIONG R L K.Government Support and RiskReturn Trade-off in China' s BOT Power Projects[J].Engineering Construction and Architectural Management,2000,7(4):412-422.
  • 9YE S,TIONG R L K.Public-Private Partnerships for Power Projects:A Case Study of Hub Power Project[J].Journal of Financial Management of Property and Construction,2004,9(3):75-89.
  • 10叶苏东.印尼Paiton电厂的开发经验及教训分析[J].项目管理技术,2005,3(7):18-22. 被引量:1

同被引文献3

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部