期刊文献+

堤防工程双层地基渗流模型截取范围初探 被引量:2

Preliminary probe into cutting-out range of seepage model for two-stratified foundation in levee engineering
下载PDF
导出
摘要 为了确定堤防工程双层地基渗流模型区域在满足渗流分析精度下的截取范围 ,从堤防工程双层地基渗流理论解出发推导出模型截取范围 (L)与渗流量计算误差 (p)之间的关系式 ,并据此求出了能满足工程应用的渗流分析精度时的模型截取范围。将这一范围称为有效长度 ,其值为 3/A。 In order to determine the cutting out range of seepage model which must meet precise requirements of seepage analysis for two stratified foundation in the levee engineering,a relation expression between length( L ) representing the model cutting out range and computed error ( p ) of seepage discharge is derived on the basis of seepage theoretical solution for two stratified foundation in the levee engineering,and, by this formula,a model cutting out range which can satisfy seepage analysis precision for engineering application may be determined.The effective length( L e ) of model is equal to 3/ A .
作者 周应虎
出处 《长江科学院院报》 EI CSCD 北大核心 2001年第2期34-36,共3页 Journal of Changjiang River Scientific Research Institute
关键词 堤防工程 双层地基 渗流模型 有效长度 levee engineering two stratified foundation seepage model effective length
  • 相关文献

参考文献4

  • 1毛昶熙.电模拟试验与渗流研究[M].北京:水利出版社,1981..
  • 2毛昶熙,渗流数值计算与程序应用,1999年
  • 3毛昶熙,电模拟试验与渗流研究,1981年
  • 4安徽省水利科学所,多层地基和减压沟井的渗流计算理论,1980年

共引文献6

同被引文献8

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部