摘要
针对三峡二期工程的复杂施工方式 ,研究了混凝土施工过程的计算机优化管理模式 ,并对成本分析模型进行了重点讨论 .其目的是 ,将施工作业、设备维护和生产管理集成为一个统一的管理与决策支持系统 ,使三峡二期工程的施工质量、施工设备的可利用率、施工生产的效率三者统一起来 ,从而实现施工管理的信息化和决策的最优化 .
In view of the complex construction style of the Three Gorges second-stage works and the situation concerning the traditional large-scale water conservancy and hydroelectric project in which the construction practice, equipment maintenance and production management in the process of the production, transmission and deposition of concrete are separated from each other and there is a lack of information exchange, the article studies the computerized optimal management style in the concrete construction process, and puts an emphasis on discussing the model of cost analysis. This study aims at incorporating the construction practice, management and decision supporting system to deal with and resolve the second-stage works of the Three Geoges Project by unifying its construction quality, the availability of its construction equipment and the efficiency of its construction practice, thereby realizing the information sharing of the construction management and the optimization of the decision on the whole.
出处
《水电能源科学》
2001年第1期63-65,80,共4页
Water Resources and Power
基金
国家电力公司1999年度科技项目计划! (SPKJ0 0 6-2 0 )
关键词
混凝土施工
施工管理
非线性规划
三峡二期工程
concrete construction
construction management
optimized decision
cost analysis
nonlinear program