3Lambrecht, Bart, Perraudin William and Satchell, Stephen (1997).Time to default in the UK mortgagemarket [J]. Economic Modelling, (10): 485-499.
4Gau, George W., (1978).A Taxonomic Model forThe Risk-Rating of Residential Mortgages [J].Journal of Business, (51): 687-706.
5Yongheng, Deng, Quigley, John M., Van Order, Robert and Mac,Freddie (1996). Mortgage default and low downpayment loans:The costs of public subsidy [J], Regional Science and Urban Economics, (6) : 263-285.
6中国工商银行信贷部.中国工商银行工商信贷手册[Z].,2001..
7Ng Ghim Hwee, Robert L. K, Tiong, Model on cash flow forecasting and risk analysis for contracting firms[J]. International Journal of Project Management , 2002,20:351363,.
8Paul R, Garvey P R, Landsdowne Z F. Risk matrix: An approach for identifying, assessing, and ranking program risks [J]. Air Force Journal of Logistics, 1998,25 : 1619.
9Roberts B B, Integrated risk management:results and lessons-learned[A], Proceedings of risk management symposium sponsored by the USAF, SMC and the aerospace and corporation[C]. February, 1999.
10Roberts B B. The benefits of integrated quantitative risk management[R]. The 12 th Annual international Symposium of the International Council on Systems Engineering.Melbourne. Australia, July 2001.