期刊文献+

基于PLC的盲斜井提升电控系统改造与实践 被引量:2

Improvement of electric control hoist system of blind inclined shafts based on PLC and its practice
下载PDF
导出
摘要 针对潼关矿业公司640分矿1号盲斜井提升电控系统,即交流串电阻电控系统,在使用过程中耗能严重、自动化程度低、维护量大、效率低,而且存在现场操作环境恶略等问题,提出并设计了一套由PLC控制变频器的交流电控系统改造方案。详细介绍了提升电控系统改造方案和改造过程。改造后的电控系统投入运行后,取得了很好的应用效果。可为类似盲斜井提升电控系统改造提供参考。 Facing the problems in the electric control hoist system in No. 1 inclined shaft of Branch 640 in Tongguan mining company that are, for the currently used alternating current resistance control system, high energy consumption,low level of automation, large maintenance work required, poor efficiency as well as the insufferable filed working conditions,the paper comes up with and designs a set of improvement scheme including the electric control system which uses PLC to control theconverter, detailing the system design ideas and processes. The improvement of the system is put into operation and proves to be good, providing guidance for similar operations.
出处 《黄金》 CAS 2014年第7期51-54,共4页 Gold
关键词 盲斜井 提升 绞车 PLC 变频器 blind inclined shaft hoist winch PLC converter
  • 相关文献

参考文献4

二级参考文献2

  • 1祝战科.对撞式超细粉磨分级系统电气控制装置的研制[D].西安:西安交通大学,2012.
  • 2成阳非金属矿物研究设计院.CC2000冲击式超细粉碎分级设备研制鉴定资料[R].2011:46.

共引文献7

同被引文献8

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部