摘要
对炼油厂 3号催化主风机组烟机出口管道振动故障进行分析和探索 ,经过几个周期的尝试 ,寻求到了一种解决问题的较好的方法和措施。
The vibration trouble of outlet pipe for the flue gas turbine of third catalytic main air set in refinery was analized and probed.By means of tries for several period,a fairly good solution and measure were found.
出处
《石油化工设备技术》
CAS
2001年第2期56-58,61,共4页
Petrochemical Equipment Technology