摘要
西藏林芝地区八一电厂二级电站后山抗滑锚固桩工程采用人工开挖成桩 ,主要以土石方、钢筋砼工程为主 ,场地自然地理、地质条件复杂 ,施工中必须注意安全 ,要防垮蹋、防流砂及防冻。
Anti-sliding anchoring piles in hydropower station valley, Bayi Town, Nyingchi, Xizang are artificial piles with earthwork and steel reinforced concrete. Safety measures in construction should include anti-collapse, anti-shifting sand and antifreezing measures because of complicated physiographic and geological conditions.