摘要
本文就烟台港西港池一期码头工程施工的成功经验,对重力式码头的总体施工工艺作一探讨,提出码头总体施工从两端开工,中间合拢且不预制异形块的施工方法。
Based on the Successful experience of the first period enqineering in the western basin of yantai the overall construction technology of the grarity ty- pe wharf was discussed. A method of construction that the overall construction starts at the two ends and closes in the middle without prefabricating the special-shaped bodg was presented.
出处
《海岸工程》
北大核心
1991年第4期8-12,共5页
Coastal Engineering